Hovrain develops seawater reverse-osmosis systems for site-specific freshwater production. A reliable SWRO proposal starts with seawater analysis, required output, intake conditions, power supply, space and operating requirements.

SWRO Configurations
- Compact seawater desalination systems
- Mobile and vehicle-mounted SWRO
- Containerized SWRO
- Engineered systems for larger project requirements
Project-Specific Process Design
Intake and pretreatment, membrane configuration, energy use, cleaning, post-treatment and reject management must be evaluated together. Product-water quality and operating targets are agreed for the specific project rather than inferred from another installation.
Mobile Desalination
Vehicle-mounted and containerized layouts can bring seawater treatment to remote or space-constrained sites. The 15 TPD vehicle-mounted SWRO project illustrates compact process and equipment integration for mobile desalination.

What We Need to Size a System
- Seawater analysis and intake description
- Required daily product-water volume
- Target water quality and intended use
- Power availability and operating hours
- Installation site, transport and space limits
- Brine-disposal requirements
Selected HR-SWRO Reference Models
These product sheets illustrate selected compact and skid-mounted HR-SWRO reference models. Seawater conditions, product-water target, voltage, recovery, power and physical arrangement must be confirmed for each project.



Reference models only. Final specifications are defined by the seawater analysis and approved technical agreement.
SWRO Equipment Range
Representative compact, enclosed, open-frame and industrial skid configurations from the available Hovrain product materials.






Reference configurations shown. Final process, capacity, components and layout are defined by the water analysis and approved technical proposal.
Frequently Asked Questions
Can one SWRO specification be used for every seawater source?
No. Salinity, temperature, suspended solids, biological conditions, intake method and the product-water target affect pretreatment, membrane selection and operating conditions.
Are recovery and energy figures fixed?
No. Recovery, pressure and energy use are project-specific and should be stated only after the water analysis and operating requirements are defined.
Discuss a Desalination Project
Share the water analysis and project requirements to begin a technical review.
